The 50-60% chance of rain is going to set us back a couple of days. Rain yesterday didn't hurt much, but don't want to start digging core ditches for the dam until this passes. The dam is about 300' long, so the core runs all the way under it.
Lake bottom is cleared, and we only have one load of timber left to move. Dozer and track hoe running right now cleaning up a bit, and scraping the roots/topsoil off and pushing the spoils to the backside of the levee for sloping.
It's growing.........may end up being 2 acres when it's all said and done. We raised the water level a foot.