IF(big if) you were building a raised foundation camp
-
- Duck South Addict
- Posts: 7779
- Joined: Sun Dec 07, 2003 11:04 pm
- Location: Crunksippi
IF(big if) you were building a raised foundation camp
What are the best options? I would untimately like to go with steel beams, but know they are pricey. Anyone recently built one and have any advice? I have a price for 30' treated wood poles for $115. If we went with steel I beams, they would have to be 40' but I know they would never have to be replaced. Anyone have a good contact for 40' beams and someone that would set and erect them?
- msudawg8087
- Duck South Addict
- Posts: 1548
- Joined: Mon Aug 11, 2008 9:54 am
- Location: Clinton, MS
-
- Duck South Addict
- Posts: 3605
- Joined: Sun Oct 26, 2008 8:59 pm
- Location: Hernando-Gwood-Nola
Re: IF(big if) you were building a raised foundation camp
Call me.
"You didn't happen to find that on the side of the road did you?"- One Shot
-
- Duck South Addict
- Posts: 2351
- Joined: Sun Feb 10, 2008 8:27 pm
- Location: Cleveland
Re: IF(big if) you were building a raised foundation camp
Are you referring to what to use for the poles to the ground.........or what the structure actually is supported by at the top of the poles?
How tall will the poles be?
Is the ground flat?
Will the poles get wet often?
Will there be a concrete pad under it?
How tall will the poles be?
Is the ground flat?
Will the poles get wet often?
Will there be a concrete pad under it?
-
- Duck South Addict
- Posts: 7779
- Joined: Sun Dec 07, 2003 11:04 pm
- Location: Crunksippi
Re: IF(big if) you were building a raised foundation camp
Concrete pad. Floods a few times a year, water may stay on it a week to a few weeks during spring rise. Im talking from ground(pad) to the top. Vertical. Ground is fairly flat.
Re: IF(big if) you were building a raised foundation camp
If its something that you plan on being in for awhile I would go metal. Its gonna cost more but should be more sturdy and take the shake out. My place is 23 feet up on pipe and the poles are sunk 12 feet deep and filled with concrete. It doesn't budge. I once had a single wide on telephone poles and it shook like a mofo.
-
- Duck South Addict
- Posts: 7779
- Joined: Sun Dec 07, 2003 11:04 pm
- Location: Crunksippi
Re: IF(big if) you were building a raised foundation camp
I may call you eventually TODO. I didnt think about pipe(assuming you are talking like drillstem) filled with concrete. This would be a long term place.
Re: IF(big if) you were building a raised foundation camp
i've got a camp near Cocodrie, LA.
Last year I had 12 - 38' treated poles sunk 18' in the ground that averaged 14" in diameter. I had 4 - 38'x4"x12" timbers attached to them 11' up and braced it with 2x12's and its pretty solid.
I've got over $6000 in this. Cost of wood adds up fast so check on cost of steel before you commit.
Last year I had 12 - 38' treated poles sunk 18' in the ground that averaged 14" in diameter. I had 4 - 38'x4"x12" timbers attached to them 11' up and braced it with 2x12's and its pretty solid.
I've got over $6000 in this. Cost of wood adds up fast so check on cost of steel before you commit.
Re: IF(big if) you were building a raised foundation camp
"Well we don't rent pigs and I figure it's better to say it right out front because a man that does like to rent pigs is... he's hard to stop" -Augustus McRae
Re: IF(big if) you were building a raised foundation camp
I know of quite a few cabins that were raised after the 11' flood with 8, 10, or 12 inch steel pipe. They would drive it in with a trackhoe not sure if they filled with concrete or not. We can normally pick up that kind of pipe for $6-12 per ft.
Re: IF(big if) you were building a raised foundation camp
I've got mine on ten inch pipe twelve feet off the ground
Re: IF(big if) you were building a raised foundation camp
Pour concrete columns in cardboard sauna tubes, steel beams on top with wood floor joist. Go look at what we did for the Blakeneys. Jt
Last edited by JLT on Wed Aug 27, 2014 7:44 pm, edited 1 time in total.
- BIG TIMBER
- Duck South Addict
- Posts: 1114
- Joined: Mon Dec 30, 2002 11:14 am
- Location: Port Gibson
Re: IF(big if) you were building a raised foundation camp
Do it just like ours, I can get you the guys number he is from purvis I think. No shaking will be there for ever.
We did the exact same as this.
Pour concrete columns, steel beams on top with wood floor joist. Go look at what we did for the Blakeneys. Jt
We did the exact same as this.
Pour concrete columns, steel beams on top with wood floor joist. Go look at what we did for the Blakeneys. Jt
Heres to Long Legged Women, Banded Greenheads, and Long Spurs!!!
-
- Duck South Addict
- Posts: 2351
- Joined: Sun Feb 10, 2008 8:27 pm
- Location: Cleveland
-
- Duck South Addict
- Posts: 3999
- Joined: Wed Jan 16, 2002 1:01 am
- Location: merigold
Re: IF(big if) you were building a raised foundation camp
For that high I would say cross braced steel.
I personally dont like the look the I beams give underneath so would go with 10 to 12 in pipe or square tubing.
the docll
I personally dont like the look the I beams give underneath so would go with 10 to 12 in pipe or square tubing.
the docll